DrawRight — Construction Draw Management
Construction Draw Management

Replace the
spreadsheet.
Keep the control.

DrawRight turns your sworn statement and draw requests into bank-ready PDFs, owner approval workflows, and a paper trail that protects everyone on the job.

7-day free trial · No credit card required

Draw Request #3 — Riverside Addition Owner Review
Riverside Addition
GC: Miller Construction · Draw 3 of 5
Budget Drawn62%
Framing $24,000 ✓
Electrical Rough $8,500 ✓
Plumbing Rough $11,200 ⏳
HVAC $9,800 Pending
75+
Hours saved per year for a 5-project GC
$15K
Value of recovered time at $150/hr annually
3–5x
ROI on the Pro plan before your second draw
1
Button to generate a complete, bank-ready draw package

The Problem

Excel wasn't
built for this.

General contractors manage millions of dollars through construction draws using spreadsheets, email threads, and handwritten notes. Every draw cycle is a scramble.

  • Draw requests built by hand — no validation, no history, no audit trail
  • Lien waivers tracked in a separate spreadsheet, or worse, a sticky note
  • Owner calls about line items you explained three draws ago
  • Bank rejects the package — formatting wrong, signatures missing, math off
  • Change orders live in texts and emails, invisible to anyone who needs them
Draw_Request_Final_v3_REAL_THIS_ONE.xlsx
Trade
Contract
This Draw
Balance
Framing
$48,000
$24,000
$24,000
Electrical
$22,000
#REF!
#VALUE!
Plumbing
$18,500
$9,250
$9,250 ??
HVAC
$14,000
$7,000
$7,000
Roofing
$16,000
$16,000
OVER BUDGET
Last edited by unknown · No version history · Lien waivers: ??? · Bank submission: manual

How It Works

Built for the way
GCs actually work.

01
Sworn Statement & Draw Management

Live math validation keeps every line item in balance. Budget health indicators flag watch items before they become problems. Full draw history with delta tracking vs prior draws.

Core Workflow
02
Owner Approval Flow

Email invite your owner to a read-only portal. They review each line item, approve or flag with notes, and you get notified instantly. A documented approval trail on every draw.

Owner Transparency
03
Bank-Ready PDF Export

One button generates your complete draw package — cover sheet, sworn statement, draw request, and lien waiver summary. Formatted for submission every time.

Instant Output
04
Change Order Tracking

Log change orders by type — owner request, unforeseen, overage, code compliance. Each CO ties to affected line items. Near-100% drawn warnings catch problems early.

Audit Trail
05
Lien Waiver Tracking

Track waiver status per sub, per draw. Tokenized email links let subs upload signed waivers directly — no account needed. Send reminders to stragglers with one click.

Legal Protection
06
Sub Bidding Platform

Upload plans, invite subs by trade, compare bids side-by-side with track record data. Award the right sub and auto-populate your sworn statement.

Coming Soon
The Math — 5 Projects / Year at $650K Avg
Hours saved per draw request 3–4 hrs
Draws per project × 5 draws
Projects per year × 5 projects
Total hours recovered 75–100 hrs
GC time value $150 / hr
Annual value recovered
$15,000
DrawRight Pro: $4,188/year · That's a 3–5× ROI

The ROI

Not a subscription.
A line item.

DrawRight at $349/month isn't a software expense — it's a project cost that pays for itself before draw two. The GCs who do the math don't ask "can I afford this." They ask why they waited.

And that's before you count the draws that don't get rejected. The lien waiver disputes that don't happen. The owners who come back because they actually understood what they were paying for.

Calculate Your ROI →

Save 3 hours per trade per project. With 20 trades, that's 60 hours back per project. Time you spend building, not formatting spreadsheets.

Built for GCs who are serious about their margins.

ROI Calculator

Your numbers.
Your savings.

Every GC's situation is different. Put in your numbers and see what DrawRight actually returns for your operation.

5
6
6 draws · typical 6-month build
3
$150
$650K
Plan
Total draw requests / year 30
Hours on draws today 90 hrs
Hours with DrawRight (~20 min/draw) 10 hrs
Time value recovered $12,000
DrawRight annual cost $4,188
Net annual return $7,812
Return on Investment 186%

That's less than one hour of your time per project. DrawRight at $349/mo is a line item, not an expense.

Start Free Trial →

Pricing

Simple. Transparent.

7-day free trial · No credit card required · Annual plans save 2 months

Starter
$149/mo

For GCs managing 1–2 active projects who want to replace Excel now.

  • 1 active project
  • Sworn statement + draw management
  • Live math validation & budget health
  • PDF export — sworn statement + draw request
  • Owner read-only view
  • Change order tracking
  • Email support
Start Free Trial
Coming Soon
Team
$599/mo

For growing operations, larger firms, and lender relationships.

  • Everything in Pro, plus:
  • Sub bidding platform
  • Blueprint & spec upload
  • Verified GC badge eligibility
  • Title / escrow integration
  • Multi-user up to 5 seats
  • Priority support + onboarding
Coming Soon